License #KH-0483217 · Licensed & Insured · 18 Years in Business · Proudly serving the greater Ashford metro area
Kitchen & Bath Remodeling

Hawthorne Avenue Bathroom Remodel

A dated tub-shower combo converted to a curbless walk-in shower after demo revealed a slow subfloor leak.

Hawthorne Avenue Bathroom Remodel — after
Hawthorne Avenue Bathroom Remodel — before
Before After

Drag the divider — or focus it and use your arrow keys — to compare before and after.

Location
Hawthorne District
Duration
3 weeks
Completed
November 2025
Project Investment
$19,600

This 1970s hall bathroom still had its original fiberglass tub-shower unit, yellowed and cracked at the caulk lines, with a persistent musty smell the Shah family assumed was just an old-house thing. Once we pulled the tub out, we found the actual cause: a slow leak at the shower valve had been wicking into the subfloor for years, softening a roughly three-foot section of plywood.

We called before cutting anything further, sent photos of the damaged subfloor, and priced the additional structural repair as a separate line item so the family could approve it before we proceeded. With the floor rebuilt, we installed a curbless walk-in shower with a linear drain, full-height porcelain tile, and a new vanity with better storage than the original medium cabinet it replaced.

The subfloor repair added six days to the original two-and-a-half week estimate, which we’d flagged as a realistic possibility given the visible staining at the initial inspection.

Learn more about Kitchen & Bath Remodeling →

More Projects

Related work.

Want results like this?

Request a Free Quote