Sunridge Kitchen Remodel
Sunridge
A closed-off 1990s kitchen opened into the dining room with new cabinetry, quartz counters, and relocated plumbing.
View project →A dated tub-shower combo converted to a curbless walk-in shower after demo revealed a slow subfloor leak.
Drag the divider — or focus it and use your arrow keys — to compare before and after.
This 1970s hall bathroom still had its original fiberglass tub-shower unit, yellowed and cracked at the caulk lines, with a persistent musty smell the Shah family assumed was just an old-house thing. Once we pulled the tub out, we found the actual cause: a slow leak at the shower valve had been wicking into the subfloor for years, softening a roughly three-foot section of plywood.
We called before cutting anything further, sent photos of the damaged subfloor, and priced the additional structural repair as a separate line item so the family could approve it before we proceeded. With the floor rebuilt, we installed a curbless walk-in shower with a linear drain, full-height porcelain tile, and a new vanity with better storage than the original medium cabinet it replaced.
The subfloor repair added six days to the original two-and-a-half week estimate, which we’d flagged as a realistic possibility given the visible staining at the initial inspection.
Sunridge
A closed-off 1990s kitchen opened into the dining room with new cabinetry, quartz counters, and relocated plumbing.
View project →Maple Heights
A 24-square architectural shingle replacement after two decades of granule loss and a slow flashing leak around the…
View project →Cedar Court
Corroded galvanized supply lines replaced with PEX after a third pinhole leak in eighteen months.
View project →