Maple Street Roof Replacement
Maple Heights
A 24-square architectural shingle replacement after two decades of granule loss and a slow flashing leak around the…
View project →A 1962 60-amp fuse box, flagged by the homeowner's insurer, replaced with a labeled 200-amp breaker panel.
Drag the divider — or focus it and use your arrow keys — to compare before and after.
Dennis Farrow’s homeowner’s insurance renewal came back with a rider requiring the home’s original 60-amp fuse box be replaced within 90 days — a common outcome for houses built before 1965 that still have their original service. The old box had no room for the dedicated circuits a modern kitchen and home office actually need, and two of the fuse sockets showed visible scorching from past overloads.
We pulled a permit, coordinated a temporary utility disconnect with the power company, and installed a new 200-amp panel with 30 clearly labeled breaker positions — room for the EV charger circuit the family plans to add next year without another panel change. The old fuse box and its exterior meter housing were removed and hauled away as part of the same job.
The utility company’s own inspector signed off on-site the same afternoon the rough work finished, and the insurance company received documentation directly from us rather than requiring the homeowner to chase down the paperwork.
Maple Heights
A 24-square architectural shingle replacement after two decades of granule loss and a slow flashing leak around the…
View project →Sunridge
A closed-off 1990s kitchen opened into the dining room with new cabinetry, quartz counters, and relocated plumbing.
View project →Hawthorne District
A dated tub-shower combo converted to a curbless walk-in shower after demo revealed a slow subfloor leak.
View project →