View project →An unfinished 950 sq ft basement converted into a family room, home office, and full bathroom.
This basement had been used for storage and laundry since the house was built, with bare concrete walls and floor and exposed joists overhead. The family wanted a family room, a small home office, and a full bathroom — which meant new framing, insulation, electrical circuits, and a bathroom rough-in tied into the existing drain stack.
We framed and insulated the perimeter walls, ran new electrical circuits (permitted and inspected as part of our standard process on any finished-basement scope), installed a suspended ceiling for future access to plumbing and ductwork, and finished the floor in engineered vinyl plank rated for below-grade moisture.
The project took six weeks against an original five-and-a-half week estimate, with the extra time going into re-routing one drain line that ran closer to a support beam than the original plans had shown — a real-world adjustment we made on-site rather than stopping work to redesign around it.
General Handyman Willow Park
A sticking exterior door, a running toilet, and two drywall patches — all fixed in a single half-day…
View project →
General Handyman Elmwood
A 320 sq ft pressure-treated deck with composite decking and cable railing, built to a corrected frost-line footing…
View project →Birchwood
A 1962 60-amp fuse box, flagged by the homeowner's insurer, replaced with a labeled 200-amp breaker panel.
View project →